2/01/07: Lot 86
has a new slab.


2/02/07: Lot 69's
slab has just been
poured.


2/02/07: Lot 66
gets roof trusses.
68 already has
their plywood
roof in place.


2/02/07: Irrigation
lines and trees
are being put into
place.


2/02/07: Work
continues on the
future Desert
Peak Parkway.
More curbing is
poured.


2/02/07: Tar
paper is added
to home #66.


2/06/07: Lot 37 is
ready to be
poured, Lot 38 is
newly poured, and
framed 35 and
walled 36 are in the
background.


2/06/07: The
curbs of the
future Desert
Peak Parkway are
poured a few feet
at a time...


2/07/07: Lot 62 has
new windows, Lot
65 gets roof tiles
lifted into place.


2/08/07: Lot 86 has
standing walls but
no roof. Behind it,
Lot 73 has tar paper,
and Lot 74 has tiles,
finished walls, and
foam insulation!


2/08/07: Landscape
piping is in place. A
few multiple head
lines sprout into
something! Guess
we'll find out in a
few months!


2/15/07: Lot 86
gets a roof... and
the framing for
elevation 'B'
begins to take
shape.




2/14/07:
(Valentine's Day!)
Lot 62 has a full
workcrew working
both inside and out.
Hope they get time
off to buy cards and
flowers! :)



2/22/07: Lot 72
turns from a slab
into a house.
Note the little
sidewalk barely
visible on the left.
(Where does that
sidewalk go? See
below!)




2/22/07: 48 hours
ago, this was a
slab. Now there's a
house on Lot 69!



2/22/07: Lot 65
is going to
have stone!



2/22/07: The view
from lot 61,
looking down the
view fence at lots
65 to 68...



2/22/07: One of
the parkway lamps
is resting, while
workmen are
raising Lot 101!



2/22/07: A
view of lots 50
to 60... and
our hill!



2/22/07:
Remember
that little
walkway
mentioned
above, near
Lot 72?
Well...



... it connects our
little community
to 25th Street!



2/23/07: Lot 61.
With the clouds, I
think this a VERY
artsy picture! :)



2/23/07: Lot 54...
your framing has
started!



2/23/07: View
from the side of
Lot 62, looking
north up 24th
Terrace.



2/23/07: Drywall is
delivered to Lot #1.
I'm going to guess
this homeowner will
be closing first!



2/23/07: Lot 69,
workmen at the
truck, inside the
home, and on the
roof. Good job!



2/27/07: Lot 63
has lumbar
stacked in the
backyard... ready
for the next
morning's work
crew!



2/27/07: Interesting.
Instead of speed
bumps, DR Horton
uses these 'tree
wells' that jut out
into the street.
Clever, no?



2/27/07: Lot 86 has
its' roof delivered.
Good thing too,
with those clouds
looming!




3/01/07: Lot 61
gets ductwork
installed.




3/12/07: Trees are
installed outside the
fence behind lots
62-67. I guess it
brings the work
area back to desert
landscaping.




3/13/07: Lot 69
gets windows.
Next door, lot 68
already is
styrofoamed!




3/13/07: Lot 86
gets windows.




3/13/07: First
layer of pavement
is down. Desert
Peak Parkway,
looking west...





... and looking
east. You can just
make out the
traffic light at
Cave Creek
Road.
One day, we'll all
be waiting there
on our way to
work!



3/13/07: Lot 1,
drywall
installed.


3/16/07: Lot 61
has windows
installed, and
roof tiles have
been delivered.


3/16/07: Lots
1 and 3 now
have stucco!


3/18/07: Lot 62's
garage is insulated.
It's a four car
garage, so I guess
this will keep the
'toys' warm... or
'cool'!



9/27/06 - 1/26/07

1/27/07 - 3/18/07

3/20/07 - 5/24/07

Move in day...
Add your own!